Meet at the little community parking lot "behind" Tildas where a playground is next to it.
NOTE: I will be there about 5..10min before as riding to the start.
We stay and work together in team formation and adjust to the pace required for most efficient moving. I'll be happy to advise on safe team style riding.
A few "play" sections at hills and a like, you'll find out, no worries, always regroup rigth after as needed.
Notes on stops/food: try to be self sufficient. But two brief snack and photo stops to eat: At Iron Pier Beach Park, and a quick stop at a nice spot in South James Port/Peconic Bay view. If some one preffers a hot coffee we can also adjust or add a stop on James Port, two options fast or even sit in there.
Note: there may still be a bridge closure (damn bridge) as of construction on the regular route, have a alt route/detour if needed.
The desired route. It just came to my attetion the bridge is completed now!
https://ridewithgps.com/routes/49201677
Last time I rode it (bride out version):
https://www.strava.com/routes/3299736883547285656
activity, need to be logged in: https://www.strava.com/activities/12917013887